MONO Oxygen Bangtao Phase 2 — two-storey frames · 1 October 2025
In the 1 October 2025 photos the Phase 2 villas stand two storeys in concrete frame: upper slabs cast on the front villas, first brickwork laid and pool shells cast.

Od ฿21.5M
Mono Oxygen Bangtao Beach
| Typ | Powierzchnia | Cena |
|---|---|---|
| 3 sypialnie | — | Na zapytanie → |
In the 1 October 2025 photos the Phase 2 villas stand two storeys in concrete frame: upper slabs cast on the front villas, first brickwork laid and pool shells cast.
In the 16 September 2025 photos the Phase 2 ground-floor concrete frames stand under scaffolding across the plots.
In the 31 May 2025 photos the Phase 2 foundations are under way: footings excavated, starter bars and formwork in place.
In the 2 November 2023 photos the Phase 2 plot (villas B1–B5) is cleared and levelled; no structures yet.
Mono Oxygen Bangtao Beach to nowa inwestycja w rejonie Bang Tao na Phuket. Invest Phuket to niezależne doradztwo — pracujemy ze wszystkimi inwestycjami na wyspie i negocjujemy w Twoim imieniu bezpośrednio z biurem sprzedaży dewelopera.
Deweloper: The Attitude Club Co.,Ltd · Profil dewelopera →
Dedykowana strona inwestycji: Otwórz stronę inwestycji ↗
Ceny, dostępność i plany płatności zmieniają się co tydzień i są potwierdzane przez dewelopera w chwili zapytania. Invest Phuket to niezależne doradztwo w zakresie nowych inwestycji.