MONO Oxygen Bangtao Phase 2 — two-storey frames · 1 October 2025
In the 1 October 2025 photos the Phase 2 villas stand two storeys in concrete frame: upper slabs cast on the front villas, first brickwork laid and pool shells cast.

От ฿21.5M
Mono Oxygen Bangtao Beach
| Тип | Площадь | Цена |
|---|---|---|
| 3-спальн. | — | По запросу → |
In the 1 October 2025 photos the Phase 2 villas stand two storeys in concrete frame: upper slabs cast on the front villas, first brickwork laid and pool shells cast.
In the 16 September 2025 photos the Phase 2 ground-floor concrete frames stand under scaffolding across the plots.
In the 31 May 2025 photos the Phase 2 foundations are under way: footings excavated, starter bars and formwork in place.
In the 2 November 2023 photos the Phase 2 plot (villas B1–B5) is cleared and levelled; no structures yet.
Mono Oxygen Bangtao Beach — новостройка в районе Bang Tao, Пхукет. Invest Phuket — независимое агентство: мы работаем со всеми проектами острова и ведём переговоры с отделом продаж застройщика за вас.
Застройщик: The Attitude Club Co.,Ltd · Профиль застройщика →
Специализированный сайт проекта: Открыть сайт проекта ↗
Цены, наличие и планы оплаты меняются еженедельно и подтверждаются застройщиком на момент запроса. Invest Phuket — независимое агентство по новостройкам.